ยป Go



BP Users Login
> Home> Safety> Site and Group Standards> Site Policy and Procedures> Hot Work Procedure
Your Role
Contractor Safety
Emergency Procedures
Emergency Equipment
Engineering Standards
Fire Prevention Plan
Iris Statistic
Office Safety
Permit Required Activities
Process Safety
Site and Group Standards
>Group Standards
>Site Policy and Procedures
>Alcohol Consumption
>Animal Restrictions
>Campus Badging Procedure
>Cell Phone Policy
>Chemical Storage in Refrigerators and Freezers
>Chemical Transport in Tunnels (Naperville)
>Confined Space Entry Procedure
>Contractor Policy
>Control of Work (CoW)
>Cutting, Coring and Drilling Procedure
>Demolition & Decommissioning
>Driving Policy
>Electrical Installations (Temporary) at 600 Volts or Less
>Electrical Safety Program
>Electrical Safety Suite
>Electrical Safety While Working On or Near Energized Electrical Parts Less than 600 Volts
>Environmental Site Policy
>Fluorescent Bulb Handling Procedure
>Grilling Policy
>Ground Disturbance and Excavation
>Hot Work Procedure
>Injury and Illness Reporting and Record Keeping Procedure
>Lift Plan Procedure
>Lifting Operations Procedure for Permit Required Lifts
>Lockout Tagout (LOTO)
>Management of Change (MOC) Procedures
>Nitrogen Process Safety Standard
>Ready For Work - Yellow Tag
>Risk Assessment and Management
>Roof Access Procedure
>Safety Orientation
>Small Appliance Policy
>Smoking Policy
>Sterno Policy
>Task Risk Assessment (TRA) Procedure
>Task Safety Analysis (TSA) Procedure
>Transporting Cylinders
>Unattended Operations
>Working Alone
>Working at Heights
Training


Hot Work Procedure

The purpose of this procedure is to minimize the potential of employee injury and property damage from fire or explosion when conducting Hot Work. Hot Work is potentially hazardous; therefore all reasonable alternatives are to be considered before choosing this option. :

The following is a list of documents associated with the Hot Work Procedures:



© 2006 BP p.l.c.   |   Legal Notice   |   Privacy statement