ยป Go



BP Users Login
> Home> Safety> Site and Group Standards> Site Policy and Procedures> Risk Assessment and Management
Your Role
Contractor Safety
Emergency Procedures
Emergency Equipment
Engineering Standards
Fire Prevention Plan
Iris Statistic
Office Safety
Permit Required Activities
Process Safety
Site and Group Standards
>Group Standards
>Site Policy and Procedures
>Alcohol Consumption
>Animal Restrictions
>Campus Badging Procedure
>Cell Phone Policy
>Chemical Storage in Refrigerators and Freezers
>Chemical Transport in Tunnels (Naperville)
>Confined Space Entry Procedure
>Contractor Policy
>Control of Work (CoW)
>Cutting, Coring and Drilling Procedure
>Demolition & Decommissioning
>Driving Policy
>Electrical Installations (Temporary) at 600 Volts or Less
>Electrical Safety Program
>Electrical Safety Suite
>Electrical Safety While Working On or Near Energized Electrical Parts Less than 600 Volts
>Environmental Site Policy
>Fluorescent Bulb Handling Procedure
>Grilling Policy
>Ground Disturbance and Excavation
>Hot Work Procedure
>Injury and Illness Reporting and Record Keeping Procedure
>Lift Plan Procedure
>Lifting Operations Procedure for Permit Required Lifts
>Lockout Tagout (LOTO)
>Management of Change (MOC) Procedures
>Nitrogen Process Safety Standard
>Ready For Work - Yellow Tag
>Risk Assessment and Management
>Roof Access Procedure
>Safety Orientation
>Small Appliance Policy
>Smoking Policy
>Sterno Policy
>Task Risk Assessment (TRA) Procedure
>Task Safety Analysis (TSA) Procedure
>Transporting Cylinders
>Unattended Operations
>Working Alone
>Working at Heights
Training


Risk Assessment and Management

Consistent with BP’s Operating Management System (OMS), this document formally sets out the Risk Assessment and Management Policy of the BP Naperville Campus.

Management of risk is a continuous process and the cornerstone of all the HSSE elements.  We will regularly identify the hazards and assess the risks associated with our activities. We will take appropriate action to manage the risks and hence prevent or reduce the impact of potential accidents or incidents.  The Entity Procedure for Assessment, Prioritization and Management of Risk outlines the entity risk process. 



© 2006 BP p.l.c.   |   Legal Notice   |   Privacy statement